![]() ![]() The canopy over the front door is supported by cast iron Corinthian columns. Intricate stone work lines the top of the building, and large iron-framed windows allowed the main ticketing hall to be filled with natural light. ![]() This stone structure was designed by Rutan and Coolidge, the designers of Boston’s South Station and Union Station in Springfield, Mass. Work is expected to be complete late in 2016.įrom 1899 to 1968, trains arrived and departed from Union Station in Albany’s downtown. The track project, funded through federal High-Speed Intercity Passenger Rail funds and NYSDOT, began construction in 2014 and will increase station capacity and improve operating flexibility, thereby leading to more efficient passenger boarding and better on-time performance. This was necessary to accommodate a fourth track at the station. The building features two-story tall windows on both ends and on its street facade, which allow natural light to flood the interior.Īmtrak and the New York State DOT (NYSDOT) completed demolition of two former Albany-Rensselaer station buildings in February 2011. Constructed of red brick, the station also has a clock tower standing two stories over the station proper. ![]() It was designed by the Schenectady architectural firm of Stracher Roth Gilmore. The current Albany-Rensselaer Amtrak station was completed in September 2002 for the Capitol District Transit Authority (CDTA). Capital District Transportation Authority (CDTA).Understanding Accessibility Requirements.North Carolina Station and Train Host Association Case Study.Surface Transportation Block Grant Program: Transportation Alternatives (TA) Set-Aside.Historic Preservation and Sustainable Design: St.Cultural Space & Museums: Cincinnati, OH.Architectural & Aesthetic Improvements: Elizabethtown, PA.Aesthetic and Architectural Improvement. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |